Open Plaza

Open Plaza Piura

SUMAC provides Project Management and Technical Inspection services at the new location of the Open Plaza Shopping Center, located in Piura, Peru. Their responsibility is to supervise the construction of the new premises in its habitable shell stage, as well as oversee a new boulevard, a warehouse, and a new commercial area. SUMAC’s tasks include […]

Decathlon Mall Plaza

Decathlon Mall Plaza

SUMAC was in charge of Project Management and Construction Supervision for the new Storeof Decathlon Colombia located in Mall Plaza Shopping Center in the city ofManizales. During the project, we supervised and coordinated the activities carried out by thecontractors responsible for civil work, lighting, flooring, security, and control,electrical, RCI, HVAC, signs, report of construction activities, […]

Decathlon Colombia

Decathlon Colombia

SUMAC was in charge of the technical design, construction management, and supervision of the new Decathlon in the Multiplaza La Felicidad shopping center in Colombia. The electrical, lighting, plumbing, fire protection, and mechanical (HVAC) designs were completed. The store was 35957 square feet, and thanks to excellent management, it was developed in five weeks by […]

Metra 3

Randolph Street Station $23 million total renovation and addition of terminal/station.

Metra 2

35th Street Station $15 million Construction of New Station at White Sox Park.

Metra

Underground Fuel Tank Assessments Study $5 million study of all of the fueling facilities including upgrade design and on site management of removals, environmental clean up, or upgrade of facilities.

World’s Largest Laundromat

SUMAC was retained to assist the Owner of “The World’s Largest Laundromat” to determine the possibility of an expansion of their business to a new location in the City of Chicago. SUMAC worked with Ownership to review several potential locations including preparing conceptual design site plans, scheduling of the entitlement process, and construction budgeting. A […]

FedEx ORD Metroplex

Services provided included full design, project management, and construction administration services for the Federal Express Metroplex at O’Hare International Airport. The building is 280,000 s.f. with 900,000 s.f. aircraft apron on a 35-acre site.The Metroplex is a package sorting facility and is the primary interface between ground and aircraft transportation. The facility contains approximately 75,000 […]

O’Hare Airport Terminal 3 Food Court Renovation

Complete renovation of the Apex Space and food court to accommodate additional concessions.Terminal 3 Food Court Renovation, this project was one of many projects issued under DOA (CDA) Task Order contract

Edmonton SET Station Gauger Lab

The South Edmonton Terminal (SET) Lab is utilized for testing of a multitude or petroleum products that are received at the main terminal in Edmonton, AB and distributed to points east and south to the United States. This was the 2nd lab designed and provided by our team. The lab houses five dedicated fume hoods […]

Cromer Station Gauger Lab

The Cromer Lab is utilized for testing of specific petroleum products that are received from incoming pipelines to the west and distributed to eastern Canada and the United States distribution systems to the east. The lab houses multiple fume hoods for containment and testing of the petroleum samples that metered off the exterior pipelines for […]

Cushing Central Gauger Lab

The Gauger lab is a specialized lab to provide self-contained sampling and testing operations for midstream petroleum company QA services. Products handled include an assortment of petroleum projects transported through the pipeline system. Lab has multiple fume hoods with various testing equipment and mixing pumps for product sampling. Lab is provided with 100% outside air […]

Viceroy Hotel

Located in the heart of Chicago’s “Gold Coast” neighborhood, the former Cedar Hotel has transformed into the Viceroy Hotel. Under the objective of having a provocative design, the architectural distinctive solution evolved from the existing context. The original 4-story brick and terracotta facade of the Cedar Hotel was rebuilt and served as inspiration for a […]

United Airlines City Ticket Office

SUMAC was in charge of the Owner’s Representation, Project Leadership, Design and Construction for the United Airlines City Ticket Office in Chile. SUMAC assisted in the analysis of potential places for rent in the Santiago business center, including required space tests, construction costs and design concepts. Once the final project location was chosen, SUMAC was […]

Walker Museum // University of Chicago

SUMAC provided Construction Management services for the renovation of administrative offices in the University of Chicago Walker Museum Building. Completed in 1893, the Walker Museum Building is one of the original historic buildings on the University of Chicago campus and originally contained a geology museum and laboratory. The renovation scope included upgrades to the office […]

Chicago State University

SUMAC was in charge of the management and supervision of the site for the project, for the renovation of four floors including the spaces dedicated to sanitary, in Chicago State University Business School Building. Working under very tight deadlines, SUMAC renewed the four floors and restrooms in a phase plan, with coordination to avoid the […]

USIL Insignia

The Insignia building is located on a 1,716 m² lot and has 9 floors and 5 basements which total 15,125 m². It has a capacity for 200 people, the library is located on the 3rd floor, the graduate classrooms are located on the 4th, 5th and 6th floors, the work of the building is complex […]

Aunt Martha’s Youth Service Center

SUMAC provided design and construction services for the renovation of Aunt Martha’s Youth Service Center locations in Carpentersville and Aurora, Illinois. Carpentersville’s location work consisted of the complete renovation of the dental clinic to add two new dental stations and improve the safety and accessibility requirements of the building. The Aurora consisted of a new […]

St. Charles

SUMAC provides Architecture, Design and acts as a developer for a new urban infill apartment project in St. Charles, Illinois, a suburb of western Chicago. The apartments consist of two independent buildings designed to complement the traditional architecture of the historic center of St. Charles. In total, both buildings contain 160 units in a combination […]

United Airlines City Ticket Office

SUMAC was in charge of the Owner’s Representation, Project Management, Design and Construction for the City Ticket Office, the office in charge and the Corporate Offices of United Airlines in Chile. SUMAC assisted in the analysis of potential rental locations in the Santiago business center, including testing of required space, construction costs, and design concepts. […]

Provident Hospital

SUMAC provided construction management and site supervision for repairs necessary to the hospital’s roof access egress stairways. Coordination of infection control, patient disruption, and premium time were managed to minimize impact on the facility.

Chicago Family Health Center

Chicago Family Health

SUMAC provided Construction Management and Sustainability and Energy Efficiency Consulting services to the new Chicago Family Health Center in Chicago, Illinois. The new medical building contains 23 examination rooms, 2 rooms for mental health consultation, 9 spaces for dental operations and various flexible spaces for the delivery of therapy and education sessions. The health center […]

Norwegian American Hospital

SUMAC provided Construction Management services at Norwegian American Hospital in Chicago, to provide repairs and upgrades in preparation for the hospital’s commission certification. The work was carried out with very tight deadlines, within which SUMAC managed a team of more than 50 contractors who were positioned through the hospital to complete plumbing, electricity, painting, and […]

Mount Sinai Hospital

SUMAC carried out the on-site Project Leadership service for this project, the work was carried out with very tight deadlines, which was based on the renewal of the section of the neonatal intensive care unit, emergency rooms and improvements were made as well. to security in fire escapes and corridors. To minimize the negative impact […]